| 100% Complete (not pretty, just complete!). |
Some pics of final re-assembly process for you:
| Clutch throw out lever and assembly installed into back side of transmission. |
| Swing arm rubber boot installed, ready to go back on bike |
| Swing arm installed on frame |
| Installed on frame. Need to attach rubber boot and clamp to transmission. |
| Final Drive attached to swing arm and rear shock. |
| Final Drive |
| Rear Wheel installed. |
| Fresh Rubber !! |
| Exhaust headers assembled and ready to go back on bike. |
| Exhaust installed on bike. |
| Final re-assembly just completed, this is right before starting it back up. |
| Plug with red marking is where Pulse Air system used to inject air into exhaust port. |
| New Kickstand! OEM option was not viable for my bike, I managed to score a Browns Side Stand. |
